Parr-instrument 6300 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Instrumentos de medida Parr-instrument 6300. Parr Instrument 6300 User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Parr Instrument Company

NO. 586MParr Instrument Company6300Oxygen Bomb CalorimeterOperating Instruction ManualFor models produced after October 2010

Página 2

PREFACEParr Instrument Company10This page left blank intentionally.

Página 3 - TABLE OF CONTENTS

FPARTS LISTS & DRAWINGSParr Instrument Company1006300 STIRRER MOTOR AND DRIVEA1255DD BUCKET STIRRER ASSEMBLYItem Description682DD Snap Ring, Inter

Página 4

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com1016309B SPARE PARTS KITItem Description643DD Pin, Check Valve906DD Capsule Holder (1136)668DD Check Va

Página 5

FPARTS LISTS & DRAWINGSParr Instrument Company102Figure F-1Parts Diagram for the 1136 and 1136CL Oxygen Bombs

Página 6

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com1031136 AND 1136CL OXYGEN BOMBKey No. Item Description1 888DD2 Cylinder2 889DD Outer Ring3 821DD (2) O-

Página 7 - PREFACE

FPARTS LISTS & DRAWINGSParr Instrument Company104Figure F-2Parts Diagram for the 1138 and 1138CL Oxygen Bombs

Página 8 - SAFETY INFORMATION

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com1051138 AND 1138CL OXYGEN BOMBKey No. Item Description1 888DD2 Cylinder2 889DD Outer Ring3 821DD O-rin

Página 9 - GETTING STARTED

FPARTS LISTS & DRAWINGSParr Instrument Company106Figure F-36300 Oxygen Bomb Calorimeter Cutaway Right

Página 10

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com107Figure F-46300 Oxygen Bomb Calorimeter Cutaway Left

Página 11 - CHAPTER 1

FPARTS LISTS & DRAWINGSParr Instrument Company108Figure F-56300 Oxygen Bomb Calorimeter Cover Open

Página 12

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com109Figure F-6A1250DD2 Control SchematicP8USB PORTJ8J10P6J1A1821EPIN #1USB PORTJ5J1BOARD TODISPLAY CABLE

Página 13 - INSTALLATION

CONCEPT OF OPERATION63001www.parrinst.com11CHAPTER 1CONCEPT OF OPERATIONA HIGHLY AUTOMATED PROCEDUREParr proudly introduces a new Oxygen Bomb Calorime

Página 14 - WAGELOK TUBE FITTINGS

FPARTS LISTS & DRAWINGSParr Instrument Company110Figure F-7A1251DD Oxygen Solenoid Assembly

Página 15

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com111Figure F-8A1200DD Internal Plumbing Diagram

Página 16

FPARTS LISTS & DRAWINGSParr Instrument Company112Figure F-9A1252DD Water Solenoid Assembly

Página 17

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com113Figure F-10A1416DD Bomb Wash Pump Assembly and Fittings

Página 18

FPARTS LISTS & DRAWINGSParr Instrument Company114Figure F-11A1254DD Circulatory Pump Assembly

Página 19

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com115Figure F-12A1255DD Bucket Stirrer AssemblyNote: Apply thread sealant (Locktite or equivalent) to set

Página 20

FPARTS LISTS & DRAWINGSParr Instrument Company116Figure F-13A1256DD Water Assembly Tank

Página 21 - CHAPTER 3

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com117Figure F-14A1257DD Water Regulator Assembly

Página 22

FPARTS LISTS & DRAWINGSParr Instrument Company118Figure F-15A1258DD Temperature Control Assembly

Página 23 - PROGRAM INSTALLATION &

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com119Figure F-16Cover Contact Pin Assembly

Página 24 - Figure 4-1

1CONCEPT OF OPERATIONParr Instrument Company12FULL MICROPROCESSOR BASED PROCESS CONTROLThe microprocessor controller in this calorimeter has been pre

Página 25 - Continued

FPARTS LISTS & DRAWINGSParr Instrument Company120Figure F-17Stirrer Motor and Mount

Página 26

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com121Figure F-18A1260DD Water Level Control Assembly

Página 27 - CHAPTER 5

FPARTS LISTS & DRAWINGSParr Instrument Company122Figure F-19A1265DD Bucket Assembly

Página 28

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com123Figure F-206300 Air Can Assembly

Página 29

FPARTS LISTS & DRAWINGSParr Instrument Company124Figure F-21A1450DD Bomb Head Assembly (1)

Página 30

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com125Figure F-22A1450DD Bomb Head Assembly (2)

Página 31

FPARTS LISTS & DRAWINGSParr Instrument Company126This page left blank intentionally.

Página 32

BOMB RINSE CONTAINER ASSEMBLY6300Gwww.parrinst.com127APPENDIX GBOMB RINSE CONTAINER ASSEMBLYOVERVIEWThe A1050DD Bomb Rinse Container Assembly is provi

Página 33

GBOMB RINSE CONTAINER ASSEMBLYParr Instrument Company128OPERATION (CONTINUED)Samples to be analyzed for chlorine should be spiked in a manner to insur

Página 35

INSTALLATION63002www.parrinst.com13CHAPTER 2INSTALLATIONREQUIRED CONSUMABLES, UTILITIES AND POWER REQUIREMENTSThe 6300 Calorimeter System requires ava

Página 36

211 53rd StreetMoline, Illinois 61265 USAPhone: 1-309-762-7716 or 1-800-872-7720Fax: 1-309-762-9453E-mail: [email protected]://www.parrinst.com Pa

Página 37

2INSTALLATIONParr Instrument Company14INSTALLING THE CALORIMETER (CONTINUED)Make the connections to the oxygen supply at •this time. Refer to figure

Página 38

INSTALLATION63002www.parrinst.com15Fitting. Make sure that the tubing rests firmly on the shoulder of the fitting and that the nut is finger-tight.Bef

Página 39 - CORRECTIONS & FINAL

2INSTALLATIONParr Instrument Company16Figure 2-26300 Calorimeter Back Panel

Página 40

INSTALLATION63002www.parrinst.com176300 CALORIMETER EXTERNAL PLUMBINGFigure 2-3Closed Loop Confi guration with 6520AO2 Regulator DI Water~Room Temp65

Página 41 - CHAPTER 7

2INSTALLATIONParr Instrument Company186300 CALORIMETER EXTERNAL PLUMBING (CONTINUED)Figure 2-5Open Loop Confi guration with 1552O2 Regulator DI Water

Página 42

INSTALLATION63002www.parrinst.com19INSTALLING THE CALORIMETER (CONTINUED)After the calorimeter displays the main menu, press •the Calorimeter Operatio

Página 44

2INSTALLATIONParr Instrument Company20This page intentionally left blank.

Página 45 - CHAPTER 9

INSTRUMENT DESCRIPTION63003www.parrinst.com21CHAPTER 3INSTRUMENT DESCRIPTIONTYPES OF CONTROLSAll calorimeter configurations and operations are handled

Página 46 - 5000 Tests

3INSTRUMENT DESCRIPTIONParr Instrument Company22This page left blank intentionally.

Página 47 - 6300 MAINTENANCE CHECKLIST

PROGRAM INSTALLATION & CONTROL63004www.parrinst.com23CHAPTER 4PROGRAM INSTALLATION & CONTROLSOFTWARE INSTALLATIONThe program in the 6300 Calor

Página 48 - BOMB EXHAUST TROUBLESHOOTING

4PROGRAM INSTALLATION & CONTROLParr Instrument Company24Calorimeter OperationsOperating Mode DeterminationBomb Installed/EE 1/940.0Heater and Pump

Página 49

PROGRAM INSTALLATION & CONTROL63004www.parrinst.com25Acid Multiplier 0.0709Sulfur Value is Percent ONSulfur Multiplier 0.6238Fuse Multiplier 1.0Us

Página 50

4PROGRAM INSTALLATION & CONTROLParr Instrument Company26This page intentionally left blank.

Página 51 - 6300 CALORIMETER ERROR LIST

OPERATING INSTRUCTIONS63005www.parrinst.com27CHAPTER 5OPERATING INSTRUCTIONSTO BEGIN A TESTWeigh the sample to 0.1 mg. 1.Gently tap the capsules that

Página 52

5OPERATING INSTRUCTIONSParr Instrument Company28Figure 5-1Fill Flow Diagram

Página 53 - INSTRUCTIONS

OPERATING INSTRUCTIONS63005www.parrinst.com29ALLOWABLE SAMPLE SIZETo stay within safe limits, the bomb should never be charged with a sample which wil

Página 54

www.parrinst.comTABLE OF CONTENTS63003PREFACE — 7Scope — 7Explanation of Symbols — 8Safety Information — 8Intended Usage — 8Cleaning & Maintenanc

Página 55

5OPERATING INSTRUCTIONSParr Instrument Company30WARNING - DO NOT OVERFILL THE BOMBThe safety relief valve on the regulator should protect the system

Página 56

OPERATING INSTRUCTIONS63005www.parrinst.com31CLOSING THE BOMBCare must be taken not to disturb the sample when moving the bomb head from the support s

Página 57

5OPERATING INSTRUCTIONSParr Instrument Company32Figure 5-4Rinse & Cool Flow Diagram

Página 58

OPERATING INSTRUCTIONS63005www.parrinst.com33POST-PERIODAfter fi ring is confi rmed, the post-period begins (see Figure 5-3).The controller monitors the

Página 59

5OPERATING INSTRUCTIONSParr Instrument Company34Figure 5-5Drain Flow Diagram

Página 60

OPERATING INSTRUCTIONS63005www.parrinst.com35SAMPLESParticle Size and Moisture ContentSolid samples burn best in an oxygen bomb when reduced to 60 mes

Página 61

5OPERATING INSTRUCTIONSParr Instrument Company36FOODSTUFFS AND CELLULOSIC MATERIALSFibrous and fluffy materials generally require one of three modes o

Página 62

OPERATING INSTRUCTIONS63005www.parrinst.com37Note:Tape should always be stored in a sealed container to minimize changes in its moisture and solvent c

Página 63

5OPERATING INSTRUCTIONSParr Instrument Company38This page intentionally left blank.

Página 64

CORRECTIONS & FINAL REPORTS63006www.parrinst.com39CHAPTER 6CORRECTIONS & FINAL REPORTSENTERING CORRECTIONS AND OBTAINING THE FINAL REPORTFinal

Página 65

Parr Instrument CompanyTABLE OF CONTENTS4APPENDIX BCALCULATIONS — 71Calculating the Heat of Combustion — 71General Calculations — 71Thermochemical Cor

Página 66

6CORRECTIONS & FINAL REPORTSParr Instrument Company40This page intentionally left blank.

Página 67

REPORTING INSTRUCTIONS63007www.parrinst.com41CHAPTER 7REPORTING INSTRUCTIONSREPORT OPTION SECTIONThe 6300 Calorimeter can transmit its stored test dat

Página 68

7REPORTING INSTRUCTIONSParr Instrument Company42REPORT GENERATION (CONTINUED)The EDIT key brings up a sub-menu which enables the operator to edit any

Página 69

FILE MANAGEMENT63008www.parrinst.com43CHAPTER 8FILE MANAGEMENTThe 6300 Calorimeter will hold data for 1000 tests in its memory. These tests may be pre

Página 70

8FILE MANAGEMENTParr Instrument Company44This page intentionally left blank.

Página 71 - APPENDIX B

MAINTENANCE & TROUBLESHOOTING63009www.parrinst.com45CHAPTER 9MAINTENANCE & TROUBLESHOOTINGROUTINE MAINTENANCENote:See the corresponding water

Página 72

9MAINTENANCE & TROUBLESHOOTINGParr Instrument Company46500 Tests (Continued)abrasive may require this maintenance to be performed on a more freque

Página 73

MAINTENANCE & TROUBLESHOOTING63009www.parrinst.com476300 MAINTENANCE CHECKLISTQuarterly MaintenanceDate Date Date DateChange waterReplace 149CClea

Página 74

9MAINTENANCE & TROUBLESHOOTINGParr Instrument Company48INSPECTION OF CRITICAL SEALING SURFACESThe sealing grooves and related surfaces for most of

Página 75

MAINTENANCE & TROUBLESHOOTING63009www.parrinst.com49WARNING:This screen allows unconditional and arbi-trary output control for testing purposes. B

Página 76

www.parrinst.comTABLE OF CONTENTS63005Figure F-2Parts Diagram for the 1138 and 1138CL Oxygen Bombs — 104Figure F-36300 Oxygen Bomb Calorimeter Cutaway

Página 77 - APPENDIX C

9MAINTENANCE & TROUBLESHOOTINGParr Instrument Company50JACKET FILL AND COOLING PROBLEMSJacket Fill Error – A problem has been detected while attem

Página 78

MAINTENANCE & TROUBLESHOOTING63009www.parrinst.com51BOMB REMOVAL AND REPLACEMENTTo service or remove the bomb cylinder from the bucket assembly, r

Página 79

9MAINTENANCE & TROUBLESHOOTINGParr Instrument Company52Rinse Tank Level May Be Low.The controller decrements the rinse tank counter each time the

Página 80

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com53APPENDIX A MENU OPERATING INSTRUCTIONS The settings and controls are organized into nine main secti

Página 81 - INTERFACES

AMENU OPERATING INSTRUCTIONSParr Instrument Company54CALORIMETER OPERATION MENU (CONTINUED)Start Preweigh:This key is used to start the sample pre-wei

Página 82

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com55Jacket Plot Symbol:Toggles between: (same as Bucket Plot Color, p. 54).Jacket Min Value:Press this k

Página 83

AMENU OPERATING INSTRUCTIONSParr Instrument Company56OPERATING CONTROLS MENU (CONTINUED)Use Spiking.• When set to ON, the calorimeter will prompt fo

Página 84

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com57Date & Time:Accesses a sub-menu to set the current date and time. Date.• Displays current date

Página 85

AMENU OPERATING INSTRUCTIONSParr Instrument Company58PROGRAM INFORMATION AND CONTROL MENU (CONTINUED)User/Factory Settings:This key leads to a sub-men

Página 86

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com59lated by the Calorimeter and accesses the sub-menu on which this limit is set. If this value is exce

Página 87

Parr Instrument CompanyTABLE OF CONTENTS6This page left blank intentionally.

Página 88

AMENU OPERATING INSTRUCTIONSParr Instrument Company60chart the value of the Heat of Combustion (HOC) of the Standard or the Energy Equivalent (EE) de

Página 89

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com61preliminary reports.When any fixed correction is set to ON, the specified value will be used in the

Página 90

AMENU OPERATING INSTRUCTIONSParr Instrument Company62THERMOCHEMICAL CALCULATIONS MENU (CONTINUED)Fixed Sulfur Correction:Press this key on the LEFT si

Página 91

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com63NET HEAT/DRY HEAT FACTORSFixed Hydrogen:Press the LEFT side to toggle this setting On/Off.Press the

Página 92

AMENU OPERATING INSTRUCTIONSParr Instrument Company64DATA ENTRY CONTROLS MENU (CONTINUED)Hydrogen Entry Mode:This key steps through the options for en

Página 93 - APPENDIX E

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com65Moisture as Received Entry Mode:This key steps through the options for entering the moisture as rece

Página 94

AMENU OPERATING INSTRUCTIONSParr Instrument Company66REPORTING CONTROLS MENU (CONTINUED)Use New EE Value in Recalculation:When set to ON, any recalcul

Página 95 - APPENDIX F

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com67Data Precision. This key allows the user to »establish the number of digits to the right of the dec

Página 96

AMENU OPERATING INSTRUCTIONSParr Instrument Company68RUN DATA FILE MANAGERThe white upper portion of the Run Data File Manager screen presents all te

Página 97

MENU OPERATING INSTRUCTIONS6300Awww.parrinst.com69Data Logger.• This key toggles the data logging function ON/OFF.Data Log Interval.• This key dis

Página 98

PREFACE6300www.parrinst.com7PREFACE SCOPEThis manual contains instructions for installing and operating the Parr 6300 Calorimeter. For ease of use, th

Página 99

AMENU OPERATING INSTRUCTIONSParr Instrument Company70DIAGNOSTICS MENU (CONTINUED)Combine Det. Reports.• Pressing this key com-bines all determinatio

Página 100 - PARTS LISTS & DRAWINGS

CALCULATIONS6300Bwww.parrinst.com71APPENDIX BCALCULATIONSCALCULATING THE HEAT OF COMBUSTIONThe 6300 Calorimeter will automatically make all of the cal

Página 101

BCALCULATIONSParr Instrument Company72THERMOCHEMICAL CORRECTIONS (CONTINUED)be calculated. In the 6300 Calorimeter this is a fixed correction of 10 c

Página 102

CALCULATIONS6300Bwww.parrinst.com73the thermochemical corrections. The 6300 Calorimeter has been programmed to permit the user to use standard solutio

Página 103

BCALCULATIONSParr Instrument Company74ACID AND SULFUR CORRECTIONS (CONTINUED)Fixed Total: The Acid Correction represents the total base required to t

Página 104

CALCULATIONS6300Bwww.parrinst.com75ISO CALCULATIONSBoth the ISO 1928 and BSI 1016: Part 5 methods for testing the calorific value of coal and coke, d

Página 105

BCALCULATIONSParr Instrument Company76This page intentionally left blank.

Página 106

STANDARDIZATION6300Cwww.parrinst.com77APPENDIX C STANDARDIZATIONSTANDARDIZING THE CALORIMETERThe Energy Equivalent Factor.The term “standardization”,

Página 107

CSTANDARDIZATIONParr Instrument Company78AUTOMATIC STATISTICAL CALCULATIONS (CONTINUED)Any outliers or other tests which should not be included in the

Página 108

STANDARDIZATION6300Cwww.parrinst.com79Table C-2Calorimeter Control Limit Values in cal/g When Benzoic Acid is Used as a Test SampleAccepted heat of c

Página 109

PREFACEParr Instrument Company8EXPLANATION OF SYMBOLSI On PositionO Off Position~ Alternating Current (AC)This CAUTION symbol may be present on the Pr

Página 110

CSTANDARDIZATIONParr Instrument Company80Table C-3Calorimeter Control Limit Values in BTU/lb When Benzoic Acid is Used as a Test SampleAccepted heat o

Página 111

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com81APPENDIX DCOMMUNICATIONS INTERFACES USB PORTUSB ConnectionThe 6300 Calorimeter is equipped with a USB

Página 112

DCOMMUNICATIONS INTERFACESParr Instrument Company82GENERIC INTERFACEField Lengthdata 9CR 1The data field should consist of 9 numeric characters (0 thr

Página 113

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com83ETHERNET INTERFACECalorimeter test data can be transferred to an Ethernet network connected computer u

Página 114

DCOMMUNICATIONS INTERFACESParr Instrument Company84to a PC running the Windows operating system. This method of file transfer, for some users, may be

Página 115

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com85The following screenshot illustrates the contents of the calorimeter data directory as presented by a

Página 116

DCOMMUNICATIONS INTERFACESParr Instrument Company86The calorimeter offers a web server service. Test reports can be viewed with a web browser using a

Página 117

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com87Clicking on the Config button will display the screen below. Changes made on this screen will change t

Página 118

DCOMMUNICATIONS INTERFACESParr Instrument Company88Clicking on the Run Data button displays a list of reports currently in the instrument memory.Click

Página 119

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com89Clicking on the System Info button will display the screen below.

Página 120

PREFACE6300www.parrinst.com9GENERAL SPECIFICATIONSElectrical Ratings120VAC, 6.0 Amps. 50/60 Hz240VAC, 3.0 Amps, 50/60 HzBefore connecting the calorime

Página 121

DCOMMUNICATIONS INTERFACESParr Instrument Company90Clicking on the LCD Snap Shot button will display the current menu screen displayed by the calorime

Página 122

COMMUNICATIONS INTERFACES6300Dwww.parrinst.com91Clicking on the Documentation button will display the screen below. Clicking on any of the links will

Página 123

DCOMMUNICATIONS INTERFACESParr Instrument Company92BAR CODE PORTThe use of barcodes in the laboratory has become a highly accurate, rapid and inexpens

Página 124

TECHNICAL SERVICE6300Ewww.parrinst.com93APPENDIX ETECHNICAL SERVICE Should you need assistance in the operation or service of your instrument, please

Página 125

ETECHNICAL SERVICEParr Instrument Company94This page intentionally left blank.

Página 126

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com95APPENDIX FPARTS LISTS & DRAWINGSPRINCIPAL ASSEMBLIES IN CALORIMETERItem Description1136/1136CL O2

Página 127 - ASSEMBLY

FPARTS LISTS & DRAWINGSParr Instrument Company96A1250DD2 CONTROLLER ASSEMBLYItem Description1926E Film Guard, LCD 1802EA1821E Speaker Assembly wi

Página 128

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com97A1257DD WATER REGULATOR ASSEMBLYItem Description1211DD Bracket, Water Regulator1244DD Regulator, Wate

Página 129

FPARTS LISTS & DRAWINGSParr Instrument Company98A1264DD AIR CAN ASSEMBLYItem Description328E Hole Plug, 3/8”344VB Connector, Male 1/8T x 1/16NPTM3

Página 130 - Revision 11/5/10

PARTS LISTS & DRAWINGS6300Fwww.parrinst.com99A1267DD ACCESSORY/INSTALLATION KITItem Description231C2 Container, PP 10L Foldable271C Cap w/ 7/16 Ho

Comentários a estes Manuais

Sem comentários