Parr-instrument 6400 Manual do Utilizador Página 29

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 28
Operation
6400
3
www.parrinst.com
27
Drain
At the completion of the bomb rinse sequence, the drain sequence begins.
Figure 3-6
Drain Flow Diagram
The water in the bucket is drained out of the bucket and routed to the drain connection. Once the bucket is
drained, the calorimeter may be opened to remove the bomb head and load the next sample.
Vista de página 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 109 110

Comentários a estes Manuais

Sem comentários